DSpace

King Saud University Repository >
King Saud University >
COLLEGES >
Science Colleges >
College of Engineering >
College of Engineering >

Please use this identifier to cite or link to this item: http://hdl.handle.net/123456789/13127

Title: Planned lead times for one-level assembly system with service level constraint
Authors: Louly, M.A.O
Dolgui, A.,
Hnaien, F.
Keywords: Assembly systems; Inventory control; Optimization; Random lead-time
Issue Date: 2008
Publisher: Institute of Electrical and Electronics Engineers (IEEE), IEEE Industrial Electronics Society (IES), Helmut Schmidt Universitat, ABB Stotz-Kontakt
Citation: IEEE Symposium on Emerging Technologies and Factory Automation, ETFA, art. #. 4638594, pp. 1504-1511.
Abstract: A problem of inventory control for assembly systems is considered where the component lead times are random. A periodic "lot for lot" policy for component supplying is studied. The decision variables are component planned lead times. The aim is to minimize the average holding cost for components while keeping a high customer service level for the finished product. Some properties and a lower bound on the cost function are proved. These results can be useful for the development of efficient exact optimization algorithms, as Branch and Bound, for example. This article's models can be used for the following MRP parameterization: the calculation the planned lead time for each component under lead time uncertainties.
URI: http://hdl.handle.net/123456789/13127
ISSN: 1424415063; 978-142441506-9
Appears in Collections:College of Engineering

Files in This Item:

File Description SizeFormat
6.doc53.5 kBMicrosoft WordView/Open

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

DSpace Software Copyright © 2002-2007 MIT and Hewlett-Packard - Feedback