|
DSpace at King Saud University >
King Saud University >
COLLEGES >
Science Colleges >
College of Engineering >
College of Engineering >
Please use this identifier to cite or link to this item:
http://hdl.handle.net/123456789/13127
|
| Title: | Planned lead times for one-level assembly system with service level constraint |
| Authors: | Louly, M.A.O Dolgui, A., Hnaien, F. |
| Keywords: | Assembly systems; Inventory control; Optimization; Random lead-time |
| Issue Date: | 2008 |
| Publisher: | Institute of Electrical and Electronics Engineers (IEEE), IEEE Industrial Electronics Society (IES), Helmut Schmidt Universitat, ABB Stotz-Kontakt |
| Citation: | IEEE Symposium on Emerging Technologies and Factory Automation, ETFA, art. #. 4638594, pp. 1504-1511. |
| Abstract: | A problem of inventory control for assembly systems is considered where the component lead times are random. A periodic "lot for lot" policy for component supplying is studied. The decision variables are component planned lead times. The aim is to minimize the average holding cost for components while keeping a high customer service level for the finished product. Some properties and a lower bound on the cost function are proved. These results can be useful for the development of efficient exact optimization algorithms, as Branch and Bound, for example. This article's models can be used for the following MRP parameterization: the calculation the planned lead time for each component under lead time uncertainties. |
| URI: | http://hdl.handle.net/123456789/13127 |
| ISSN: | 1424415063; 978-142441506-9 |
| Appears in Collections: | College of Engineering
|
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
|